Projects
The following are projects in which Bernhard Kepp has been involved in recent year.
2006-08 - Construction of Lysaker railway station (Norway/Oslo)
- Contracted by: Jernbaneverket Utbygging (Norwegian railroad authorities)
- Follow-up of concrete and steel structures, quality management, materialstechnology
2005 - ALT (Adriatic LNG-Terminal) -project
- Contracted by: Aker Kværner, Norway
- In charge of quality surveillance at construction site in Algeciras/Spain
2003-04 - ALT-project
- Contracted by: ExxonMobil, Houston
- Engineering interface-management and construction engineering for the terminal structure
2002-03 - Construction of Sandvika railway station (Norway/Oslo)
- Contracted by: Jernbaneverket Utbygging (Norwegian railroad authorities)
- Follow-up of concrete and steel structures, quality management, materialstechnology
2000-01 - Quality systems for building activities
- Contracted by: Telenor ASA
- Establishing QA-systems according to the Norwegian building code
1997-99 - "Jotun" Floating Production Vessel (FPSO)
- Contracted by: Esso Norge AS
- Owner representative during engineering and fabrication of the load bearing steel structures of the vessel